RudderStack’s smart alerting capabilities let you set up notifications for critical data issues so you can take appropriate actions immediately before they escalate into major problems.

Overview

With RudderStack’s alerting feature, you can configure alerts for:

  • Event Stream latency
  • Event delivery failures
  • Pre-sync or sync failures
  • Event volume drops
  • High event volume
  • Transformation failures
  • Tracking Plan violations
  • Partial row failures and fatal syncs (for Reverse ETL connections)
  • Profiles run failures

You can also use the alerting feature to:

  • Set up alert delivery channels of your choice like email, Slack, PagerDuty, Incident.io, custom webhook, or Microsoft Teams. Once the alert threshold is hit, RudderStack automatically delivers alerts to these systems.
  • Set failure thresholds at the workspace and resource level, so you are alerted only when necessary.

Required permissions

Alert Overrides permissions in new Access Management system

Permissions for legacy RBAC system

In the legacy Permissions Management (RBAC) system:

  • Only Org Admins can set up workspace-level alerts
  • Only Org Admins and members with the Connections Admin role in their workspace policy can set up resource-level alerts
Data Catalog permissions in the legacy framework

Workspace-level alerts

Go to Settings > Workspace and click the Alerts tab to set up the workspace-level alerts.

Alerts option in RudderStack dashboard

RudderStack automatically delivers alerts on the configured channels if the failures exceed the threshold percentage within the last one hour.

If you set the error threshold to 0%, even a single failure in processing or delivering events will trigger an alert.

The following sections detail the different alert types available per RudderStack feature:

Event Stream

In this section, you can configure alerts and set thresholds for the following incidents:

Failure type
Description
Applicable to
Cloud destination pipeline failuresFailures in processing or delivering events to a destination due to incorrect credentials, destination downtime, network error, or any other reason.Event Stream destinations
P95 latency
Enterprise plan only
Maximum latency for 95% of the events to reach the destination.

See P95 latency alerts for more details.
Event Stream destinations
Warehouse pre-sync failuresFailures in processing or storing the events in object storage before forwarding them to the warehouse destination.Warehouse destinations
Warehouse sync failuresFailures in syncing events to a warehouse destination, that is, syncs to a warehouse destination are aborted. Possible reasons include:

  • Incorrect warehouse connection credentials
  • Warehouse settings changed/updated midway through the syncs
  • Source/destination downtime or network error
Warehouse destinations
Low event volumeEvent volume drop in the last one hour is more than the configured threshold, as compared to the same period from the last week.

See Low event volume alerts for more details.
Event Stream sources
High event volumeEvent volume rise in the last one hour is more than the configured threshold, as compared to the same period from the last week.

See High event volume alerts for more details.
Event Stream sources
Tracking Plan violationsTracking Plan violations for a particular source, that is, the incoming source events and properties do not comply with the Tracking Plan connected to that source.Event Stream sources
Transformation failuresFailures in processing events due to errors in the transformation.

See Transformation failure alerts for more details.
Transformations

P95 latency alerts

P95 latency alerts are available only in the Enterprise plan.

RudderStack triggers the P95 latency alert if the maximum latency experienced by 95% of the events to reach the destination exceeds the specified threshold.

For example, if you send 100 events to an Event Stream destination and the P95 latency alert threshold is set to 15 minutes, then 95 of those events should be delivered in strictly less than the specified threshold (that is, 15 minutes). Otherwise, RudderStack triggers an alert.

Important considerations

The P95 latency metric and alerts are applicable only for Event Stream destinations connected to sources in cloud mode. They are not applicable for:

Go to the Events tab of your Event Stream destination and click the Latency tab to check the average P95 latency across all Event Stream sources.

P95 latency for destination

To view the P95 latency for events coming from a particular source, filter the Event Stream source from the dropdown:

View source-specific P95 latency

Low event volume alerts

RudderStack triggers the Low event volume alert if the event volume drop for an Event Stream source in the last one hour exceeds the configured threshold compared to the event volume for the same time period in the last week.

The Low event volume alert is triggered based on the below formula:

Equation to calculate low event volume triggers

For example, you will get an alert if:

  • An Event Stream source ingests 450 events within the last hour (for example, 11 a.m. to 12 p.m.), but it ingested 1000 events from 11 a.m. to 12 p.m. a week before.
  • The alert threshold was set to 50%.

In this case, RudderStack triggers an alert as the volume drop percentage (55%) exceeds the configured threshold (50%).

Note that:

  • A 0% threshold indicates that RudderStack triggers an alert even if the number of ingested events in the past one hour is the same as last week. That is, last_week_window_count = current_window_count.
  • A 100% threshold indicates that RudderStack triggers an alert if the source ingested no events in the last one hour but some events (>0) exactly a week before. That is, current_window_count = 0 and last_week_window_count > 0.

High event volume alerts

RudderStack triggers the High event volume alert if the event volume rise for an Event Stream source in the last one hour exceeds the configured threshold compared to the event volume for the same time period in the last week.

The High event volume alert is triggered based on the below formula:

volume_rise_percentage = (current_window_count - last_week_window_count) / last_week_window_count × 100

For example, you will get an alert if:

  • An Event Stream source ingests 3000 events within the last hour (for example, 11 a.m. to 12 p.m.), but it ingested 1000 events from 11 a.m. to 12 p.m. a week before.
  • The alert threshold was set to 100%.

In this case, RudderStack triggers an alert as the volume rise percentage (200%) exceeds the configured threshold (100%).

Note that:

  • The threshold ranges from 10% to 500%. A 100% threshold means the source ingested at least twice as many events as in the same hour last week.
  • RudderStack does not trigger this alert if the source ingested no events in the same hour last week, for example, a source created less than a week ago. That is, last_week_window_count = 0.

Transformation failure alerts

RudderStack triggers the Transformation failures alert if the transformation failures in the last one hour exceed the configured threshold.

For example, if you set the Transformation failures alert threshold to 10% and the transformation ingests 100 events in the last one hour, RudderStack triggers an alert once 11 of those events fail to transform as per the specified logic.

Reverse ETL

In this section, you can configure alerts for the following incidents applicable to all your Reverse ETL sources:

Failure typeDescription
Partial row failuresFailures in syncing records from the warehouse source to the connected destination.
Sync row failures
Beta
Failures in syncing rows from the warehouse source to the connected destination, scoped at an individual sync level.
Fatal syncsFatal errors causing a running sync to be aborted. Possible reasons include:
  • Incorrect warehouse connection credentials
  • Warehouse settings changed/updated midway through the syncs
  • Source/destination downtime or network error

Partial row failures vs. Sync row failures

This section details the differences between Partial row failures and Sync row failures.

Partial row failures

Partial row failures trigger an alert when the number of failed rows exceeds the configured threshold for a particular connection within a rolling 1 hour time window, irrespective of the number of syncs completed within that time.

RudderStack evaluates this alert while a sync is still running, so you get feedback without waiting for the sync to finish. Sync row failures, by contrast, are evaluated only after each sync completes.

Sync row failures

StabilityBeta

Sync row failures trigger an alert when the number of failed rows exceeds the configured threshold. RudderStack evaluates the failure count and triggers alerts at the end of each sync.

The same 24-hour alert delivery limit applies to this alert type as with other RudderStack alerts.

RudderStack recommends using:

  • Partial row failures to monitor overall connection health and get quick feedback on any failures
  • Sync row failures to monitor the health of a particular sync and get fewer alerts

Both alert types follow the same 24-hour alert delivery limit as your other alerts — at most one notification per resource per alert type per channel in any 24-hour period.

Profiles

In this section, you can configure alerts for the following incidents applicable to your Profiles runs:

Failure typeDescription
Run failuresFailures encountered while running your Profiles project.

Custom alerts

Click the Custom alerts setting present below each failure type to view the resources for which custom alert overrides are configured:

Custom alert setting

The resulting sidebar lists all the resources with custom alerts categorized by failure type. You also see the following information:

  • Name: The resource name.
  • Subscribed: Whether alerts are on or off for that failure type.
  • Threshold: Custom alert threshold value set for that resource.

Click on a resource to change these settings.

Custom alerts

Resource-level alerts

A resource inherits all workspace-level alert settings except the ones you explicitly override.

For example, if you override the setting for the Low event volume alert type for an Event Stream source but do not change the Tracking Plan violations alert, then the latter continues to reflect the setting specified at the workspace level.

To configure resource-level alerts:

  1. Go to the resource (source, destination, transformation, or a Profiles project) and click the Alerts tab.
Resource-level alert settings
  1. If configured, you will see the workspace-level alert settings and thresholds for the resource by default. Set custom thresholds for this resource as needed.
  2. Click Create override in the confirmation dialog to set the override.
Confirm resource-level alert override

Reset an alert override

To revert an alert override back to the default workspace setting:

  1. Click the reset icon (rounded arrow) next to the custom setting for the alert.
Revert to default workspace setting
  1. Click Reset on the resulting confirmation dialog to remove the custom settings.
Revert to workspace setting confirmation dialog

Set delivery channels for a resource

You can set up specific alert delivery channels for individual resources. This gives you fine-grained control over how alerts are routed, allowing different resources to send notifications to different channels based on your operational needs.

To set up resource-level alert delivery channels:

  1. Go to the resource and click the Alerts tab.
  2. Under the Channels section, click Setup next to the channel you want to configure.
  3. Configure your preferred platform just as you would at the workspace level.

Note that:

  • These resource-level alert delivery channel settings override the workspace-level settings for that resource only.
  • If no channel overrides are set, or you have explicitly disabled all alert delivery channels for that resource, RudderStack automatically forwards all alerts to the channels configured at the workspace level.
Dashboard messaging when no channel is configured for a resource

To revert the channel overrides back to the default workspace settings:

  1. Click the reset icon (rounded arrow) next to the custom setting for the delivery channel.
Revert to default workspace setting
  1. Click Reset on the resulting confirmation dialog to remove the custom settings and revert to the default workspace setting.
Revert to workspace setting confirmation dialog

Resource-specific alert types

The following table lists the alert types applicable to a particular resource:

Resource typeAlert type
Event Stream source
  • Low event volume
  • High event volume
  • Tracking Plan violations
Event Stream destination
  • P95 Latency (only for cloud mode)
  • Cloud destination failures
TransformationTransformation failures
Warehouse destination
  • Warehouse pre-sync failures
  • Warehouse sync failures
Reverse ETL source
  • Partial row failures
  • Fatal syncs
Profiles projectRun failures

Set up alert delivery channels

You can set up dedicated alert delivery channels to get notified whenever your resources (sources, destinations, transformations, or Profiles projects) have failures or errors. This allows you to take proactive measures to fix the problems before they escalate into major issues.

These channels apply to your whole workspace. To route the alerts for a specific resource elsewhere, see Set delivery channels for a resource.

Note that:

  • You must enable at least one alert delivery channel to receive alerts.
  • You can set up separate alert delivery channels for your Event Stream and Reverse ETL pipelines.
  • Toggling off alerts for a channel automatically removes all the configurations. You will have to reconfigure the channel to use it again.
  • RudderStack limits the alert delivery to one alert per resource per alert type for each configured channel every 24 hours.

RudderStack provides the following alert delivery channel options:

Slack

  1. In the dashboard, click the Setup button next to Slack.
Slack channel configuration for alerts
  1. In the popup window, select your Slack Workspace and Channel. Authorize RudderStack to post the alerts by clicking Allow.
You should be an admin of the Slack workspace to grant RudderStack the necessary permissions to post to that channel.
Slack channel configuration for alerts
  1. Click Send test alert to send a test alert to the configured Slack channel.
Slack channel configuration for alerts
  1. Once the alert is triggered, RudderStack automatically sends a notification on the specified Slack channel. Click Review on RudderStack to go to the specific resource to investigate and fix the errors.
Slack alerts

Microsoft Teams

  1. Create an incoming webhook for the Teams channel you wish to use.
  2. In the dashboard, click the Setup button next to MS Teams.
  3. Enter the incoming webhook URL to receive alerts on your preferred Teams channel. Then, click Save.
Teams channel configuration for alerts
  1. Click Send test alert to send a test alert to the configured Teams channel.
  2. Once the alert is triggered, RudderStack automatically sends a notification on the specified Teams channel. Click Review on RudderStack to go to the specific resource to investigate and fix the errors.
Teams alerts

PagerDuty

  1. Create a service with an Events API v2 integration in your PagerDuty account and obtain the integration key.
  2. In the dashboard, click the Setup button next to PagerDuty.
  3. Specify the Integration Key to receive alerts as PagerDuty incidents.
PagerDuty alerts
  1. Click Send test alert to send a test alert to your PagerDuty account.

Incident.io

  1. Create an HTTP alert source in your Incident.io account and obtain the following credentials:
  • Secret token (API key)
  • Alert source config ID
  1. In the dashboard, click the Setup button next to Incident.io.
  2. Specify the API Key and Alert Source Config ID to receive alerts as Incident.io incidents.
Incident.io alerts

Webhook

  1. In the dashboard, click the Setup button next to Webhook.
  2. Specify the webhook URL to receive the alerts. Then, click Save.

RudderStack sends the alerts as a POST request to the configured endpoint while following the Prometheus styling format.

Prometheus is a widely accepted monitoring and alerting tool. Its alert format is compatible with various other monitoring and incident management tools like Squadcast, PagerDuty, etc.

A sample webhook response is shown:

json
{
  "alerts": [{
    "endsAt": "0001-01-01T00:00:00Z",
    "labels": {
      "severity": "critical",
      "alertname": "partial-row-failures",
      "workspace": "<workspace_name>",
      "destination": "Failing Webhook",
      "workspaceId": "<workspace_id>",
      "organization": "<org_name>",
      "destinationId": "<destination_id>",
      "organizationId": "<org_id>",
      "configuredThreshold": 61
    },
    "status": "firing",
    "startsAt": "2024-02-05T00:02:49.933Z",
    "annotations": {
      "description": "Errors in processing or delivering events to Failing Webhook destination have exceeded the configured threshold of 61% within last 1 hour"
    },
    "fingerPrint": "d9885cc7f11b8db0"
  }],
  "status": "firing"
}

Send alerts to downstream tools

You can also leverage webhooks to forward the alerts to any RudderStack-supported downstream tool:

  1. Set up a webhook source. Note the webhook URL containing the source write key parameter.
Webhook source
  1. Set up a destination integration, for example, PagerDuty. Connect it to the webhook source created in Step 1.
  2. Once you set up the connection, specify the webhook source URL obtained in Step 1 in the Enter URL field where RudderStack forwards the alerts.
Webhook configuration for alerts

Email

  1. In the dashboard, click the Setup button next to Email.
  2. Specify comma-separated email addresses of the users who would like to receive the alerts. Click Add to add more email addresses. Then, click Save.
Email alerts

Once the alert is triggered, these users will automatically get email alerts to investigate and fix the errors.

Email alerts

Alert delivery frequency

RudderStack limits the alert delivery to one alert per resource per alert type for each configured channel every 24 hours.

This alerting logic ensures you are not spammed with notifications, especially in cases where you have configured multiple alert types for your pipelines and some resources have their own overrides (custom alert settings) in place.

Example

Suppose you get a Partial row failures alert for a particular Reverse ETL source. You will not get another alert for the same failure type for another 24 hours even if your data syncs are scheduled at a lesser frequency (for example, every one, five, or 12 hours).

However, if that source encounters another failure type like a fatal sync, RudderStack will trigger an alert.


Questions? Let's figure it out together.

Join the RudderStack Slack community to connect with other users, customers, and the RudderStack team — or reach out for direct support.